Project Details

The project is located within the Runway 17R-35L Complex and includes the rehabilitation of pavements for Runway 17R-35L, Parallel Taxiways L and M, Connector Taxiways A – M10, and Deice Pad D.

Included with the pavement rehabilitation on the pavements listed above, the flowing improvements will also be performed:

  • Reconstruction of Taxiway M6 to current FAA Advisory Circular 150/5300-13A Change 1 standards
  • Widening the taxiway safety areas on Taxiways L and M to Airplane Design Group (ADG) V criteria
  • Spall repair
  • Joint repair and rehabilitation of the entire complex
  • Airfield Electrical improvements and modifications

Shrewsberry provided airfield engineering design services for the project. Design services included demolition plans, grading design, and construction plan development.