Project Details

This project involved the reconstruction of S.R. 38 on the east side of the Town of Dayton, as an extension of a 2010 project that ended at a crest vertical curve at Conjunction Street. Shrewsberry’s project began at Conjunction Street and continued east to the Town limits. The old asphalt pavement in this segment of S.R. 38 exhibited extensive fatigue cracking, rutting, and patching,, indicating the pavement was age-hardened and had drainage deficiencies. The purpose of the project was to replace failing pavement to restore the roadway’s structural capacity and serviceability, improve pedestrian facilities in accordance with current Americans with Disabilities Act (ADA) accessibility standards, and provide proper stormwater drainage for the roadway.
Shrewsberry prepared an Engineering Assessment Report to define the project’s design criteria and to determine an appropriate stormwater outlet location and survey limits. To satisfy local stormwater standards, the project included a 48-inch diameter storm sewer pipe for in-line detention plus
offline stormwater quality structures prior to storm sewer outlet points. Other services included topographic and route survey, environmental document preparation, permitting, geotechnical investigation, right-of-way engineering, and utility coordination. Additionally, we coordinated with the designer of the adjacent S.R. 38 project from Dayton to U.S. 421.